Planning

Before your turnkey interior project

Before appointing a turnkey interior contractor, define the scope, budget, drawings, approvals and site readiness.

By Sree Balaji Interiors · Interior project planning

What should you settle before hiring a turnkey interior contractor?

Settle five things first: a written brief, the scope of work, a realistic budget range, the drawings and site information you have, and who will make decisions. With these in place, contractors can quote on the same basis, and you can compare them fairly. Without them, every quotation is a guess, and the gaps show up later as extra costs.

Start with the brief

Describe who will use the space, how it needs to work and what must change. For an office, that means headcount today and in two to three years, teams, meeting needs, visitors and any equipment. For a home, it means the family, daily routines, storage, guests and future plans. Record the location, approximate area, current condition and the date you need to move in or open.

Share any drawings, a floor plan from the landlord or builder, and photographs. A floor plan with measurements saves time; photographs show the condition of existing ceilings, floors and services.

Define what is included

List the work you expect: civil changes, electrical, plumbing, air-conditioning, ceilings, flooring, joinery, furniture, painting and finishing. Then list what is not in the contractor's scope, such as items you will buy yourself, IT and AV equipment, or work by the landlord. Agree who coordinates those interfaces. Many disputes come from items that everyone assumed someone else was doing.

Ask the contractor to confirm in writing:

  • what "turnkey" covers in their quotation,
  • which approvals they will handle and which you must obtain,
  • whether GST, transport, site protection and final cleaning are included.

Check the site and building rules

Visit the site with the contractor before the quotation is final. Check the condition of the floor, walls and ceiling, the existing electrical load, water and drainage points, and air-conditioning. In an office building, ask building management for its fit-out manual: approval process, working hours, service-lift booking, security deposit and fire safety requirements. In a housing society, check permitted working hours and rules for material movement and debris.

Set a budget range, not a single number

Decide a range you are comfortable with and share it. A range lets the contractor suggest where to spend and where to save. Keep a contingency for things found after opening up existing work, especially in renovations.

Set a decision process

Nominate one person to approve designs, samples, costs and changes. Agree how design changes, cost changes and progress will be recorded, for example a written change note signed by both sides. Agree how often you will get updates and in what form.

A realistic programme accounts for approvals, material lead times and decision time as well as installation. Review these assumptions together before agreeing a completion date. See how long an interior project takes.

Checklist: ready to appoint a contractor?

  • Written brief: users, functions, must-haves, target date
  • Floor plan or drawings, plus site photographs
  • Scope list, including what is excluded and who supplies what
  • Budget range and contingency
  • Building or society fit-out rules collected
  • One named decision-maker
  • Agreed change-approval method
  • Target date with approvals and lead times considered

Explore our turnkey design and build service and project delivery process to understand how these decisions connect to execution.

Discuss your project with us →

Planning your project

Questions before you begin.

Do I need drawings before contacting an interior contractor?

No. A floor plan and photographs are enough to start a conversation. A turnkey contractor such as SBI can measure the site and prepare the layout and drawings. If your architect has already made drawings, share them; the contractor will check what is needed for execution.

How many quotations should I get?

Two or three is usually enough, as long as each is based on the same brief, drawings and scope. More quotations on different assumptions make comparison harder, not easier. See our guide to comparing interior quotations.

What is the most common mistake before an interior project?

Starting without a written scope. When inclusions and exclusions are not written down, the cheapest quotation often grows during the project as "extras" appear. A clear scope list, agreed before work starts, prevents most cost and time disputes.

Read our interior project planning guides →